So! We had a terrific casual table reading with a good chunk of the production team and some volunteer actors. Got a chance to hear the show out loud for the first time in a while. Had a blast, a lot of the changes we’ve been making have really improved the show. There was one section when we forgot it was a musical… so there may be a new song coming.
Casting is coming along… stay tuned.
Czerton has finished the set design and he and Steve B are mapping out all of the transitions.
Best part about the reading: We ran 91 minutes. Our aim is to have a total running time of 90 minutes. So, we still have 5-10 minutes to trim before we get into the theater ((to leave room for transitions, laughs(?) & applause (?)), but its a hell of a lot better than last reading which took 110 minutes.
We’re filming something awesome tomorrow. Look for it soon.
After the reading and after a script meeting with Steve B last night, I’ve finished the new draft of the script. Added the new song and make a ton of little nips and tucks and transplants. And the script is now 5 pages shorter! This is good.
Can I just say how awesome the entire IGF team is? Its a huge operation now and everybody is just so darned good. I’m so excited.

